News

RSS Feed

  • CSPA Joins in Comments on Shasta Dam Raise EIS

    On 30 September 2013, CSPA and the Environmental Water Caucus submitted voluminous comments on the major inadequacies of the Draft Environmental Impact Statement for the proposed raising of Shasta Dam.  Shasta Dam captures water from the Upper Sacramento, McCloud and Pit rivers and is the largest reservoir in the state.  It supplies water to the

    Read More

  • CSPA Submits Comments on MAST Report

    CSPA has provided extensive comments on the draft Interagency Ecological Program’s (IEP) MAST (Management, Analysis and Synthesis Team) report.   The MAST report is an updated conceptual model for Delta smelt and is intended to synthesize the latest scientific data and information on Delta smelt responses to recent changes in habitat conditions due to hydrology and

    Read More

  • CSPA Issues Notice of Intent to Sue Recycling Facility in Gault California

    On 30 September 2013, CSPA sent a Notice of Intent to Sue Gault Recyclers in Gault California for violations of the federal Clean Water Act.  The notice letter alleges that the scrap materials recycling facility illegally discharges polluted stormwater to Deadman Gulch, which flows into the Cosumnes River and the Sacramento-San Joaquin Delta, in violation

    Read More

  • Summer Townet Delta Smelt and Striped Bass Indices Plunge Again

    The California Department of Fish and Wildlife has released the 2013 Summer Townet Surveys for Delta Smelt and Striped Bass.  The abundance index for Delta smelt is 0.7 and down from indices of the previous two years and similar to the low indices from 2005-2010.  The index was 62.5 in 1978.  The striped bass index

    Read More

  • CSPA Comments on Bureau’s CVP Cross Valley Contracts

    On 26 September 2013, CSPA and a coalition of environmental and fishing organizations submitted extensive comments on the Draft Environmental Assessment for the Cross-Valley Contractors Interim Renewal Contracts and the Draft FONSI (Finding of No Significant Impact) for the Cross-Valley Contractors Interim Renewal Contracts. The interim contract renewal is the latest of a series of

    Read More

Browse By Date

Browse By Category